PPP positions one receiver from its own code and carrier phase with precise satellite orbits and clocks, without a base station. It runs on /positioning (one file, static or kinematic) and on /campaign (daily static solutions of many stations). Both use the same engine in gnss-js; they differ in some defaults, listed below. The result is in ITRF2020 (IGS20) at the epoch of the observations. This page describes the float solution; integer fixing is on PPP ambiguity fixing, and the models shared with the other methods (antenna, troposphere, tides, frames) on Shared models.
Observation model
The default engine forms the ionosphere-free combination of two signals per satellite, which removes the first-order ionospheric delay:
and models them as
LIF = ρ + c·dtr,g − c·dts + mh(e)·ZHD + mw(e)·ZWD + mg(e)·(GN cos a + GE sin a) + λIFw + BIF + εL
ρ is the geometric range from the satellite antenna phase centre at emission to the receiver antenna phase centre at reception, with all station displacements applied (solid-earth tides, ocean loading and, on /campaign, the pole tides and atmospheric tide loading); dtr,g the receiver clock of the satellite's clock group; dts the product's satellite clock with the periodic relativistic term −2r·v/c²; ZHD the a priori hydrostatic zenith delay; ZWD and the gradients GN, GE estimated; mg the Chen & Herring gradient mapping 1/(sin e tan e + 0.0032); w the phase wind-up (Wu et al. 1993); BIF the float ambiguity in metres, which also absorbs the receiver and satellite phase biases. The emission time is found iteratively from the pseudorange, and the satellite position is rotated for the Earth's rotation during the signal's travel (Sagnac).
The default pairs are those the precise clocks refer to: GPS L1 with L2 P(Y) (C1W, else C1C; L2C on receivers that log no P(Y)), GLONASS L1/L2 on each satellite's frequency channel, Galileo E1/E5a and BeiDou B1C/B2a. Other pairs can be chosen under the advanced settings for experiments; the precise clocks then no longer match the signals, and the difference goes into the float ambiguities.
Uncombined engine (opt-in)
The uncombined engine enters every code and carrier of every tracked frequency as itself, and estimates the slant ionospheric delay I of each satellite (at 1575.42 MHz, scaled by μj = fref²/fj²) instead of eliminating it:
Lj = ρ + c·dtr,g − c·dts + T − μjI + Bj + ΔLj
The first two signals of a satellite define the clock and ionosphere datum; each further signal carries a receiver code bias dj per clock group and tracking code, and the third GPS frequency an inter-frequency clock bias (Block IIF and later). Antenna offsets and wind-up are applied per band (ΔPj, ΔLj). The ionosphere is white noise by default, so with two frequencies the estimates equal the ionosphere-free engine's — the test suite checks that equivalence. Per signal the code σ is 0.5 m and the phase σ 3 mm at zenith. The engine uses about three times the CPU of the default one.
Estimated parameters and stochastic model
- Position — static: one constant state; kinematic: white noise (σ 60 m), re-estimated each epoch while the ambiguities and troposphere carry over. A kinematic session may start with a static period on a known mark.
- Receiver clocks — white noise, one per clock group, so each constellation has its own clock and the inter-system biases need no separate parameter. With BeiDou in use, BeiDou-2, BeiDou-3 CAST and BeiDou-3 SECM satellites get separate clocks: they show inter-satellite-type biases at the centimetre-to-decimetre level.
- Troposphere — the zenith wet delay as a random walk of 3.5 mm/√h, applied over the time between epochs so 1 s and 30 s files get the same model; optionally north and east gradients (random walk 0.3 mm/√h).
- Ambiguities — one float ionosphere-free ambiguity per satellite arc, in metres; a new arc or an unrepaired cycle slip starts a new one.
The filter processes the measurements one at a time (sequential scalar updates). Observations are weighted by σ²/sin²e with sin e floored at 0.1, i.e. 1/cos²z down to about 6° and flat below.
Corrections applied
- Satellite antenna — phase-centre offset (PCO) in the satellite body frame and nadir-dependent variation (PCV), from the model the orbit and clock product was computed with: IGS20 (igs20.atx), or ESA's own Galileo and BeiDou values when the product is ESA's. A satellite with no calibration at all (a new launch before the ANTEX has it) is left out rather than used uncorrected. Attitude: nominal yaw steering; /campaign can use eclipse models or the product's ORBEX quaternions instead.
- Receiver antenna — PCO and elevation-dependent PCV from IGS20, combined ionosphere-free for the pair, plus the marker-to-ARP height (applied even when the antenna is not calibrated). Fallbacks and limits are on Shared models.
- Phase wind-up — Wu et al. (1993), unwrapped per satellite.
- Station displacements — solid-earth tides (IERS 2010 Steps 1 and 2), ocean tide loading (from the built-in grid or a pasted BLQ entry), and on /campaign the solid-earth pole tide, ocean pole tide and S1/S2 atmospheric tide loading.
- Relativity and Earth rotation — the periodic clock term and the Sagnac rotation, as above.
- Troposphere — a priori hydrostatic delay and mapping from VMF3, else GPT3, else Saastamoinen with Niell mapping (see Shared models).
- Satellite code and phase biases — float solutions use the product's clocks as they are: the default pairs are the clocks' reference pairs, so no code bias is applied. With ambiguity fixing, the product's observable-specific biases (OSB, Bias-SINEX) are removed from code and carrier.
Not modelled: the higher-order ionospheric terms (available in gnss-js, off on the site), the azimuth-dependent part of antenna PCV, and the gravitational (Shapiro) path delay.
Orbit and clock products
The orbits and clocks are chosen per day, best first: ESA's MGEX final (5 January 2014 to 25 June 2026, when ESA stopped publishing it), CODE's MGEX final (from 27 November 2022), GFZ's rapid product (about a day after the observations), ESA's final and rapid, and for 1994–2022 GFZ's solution of the IGS third reprocessing. With ambiguity fixing — the default — CODE's final integer-clock products replace this choice when they are out, else CNES's (see PPP ambiguity fixing). The orbits are interpolated with a 9-point Lagrange polynomial; the clocks linearly between samples.
Constellations
PPP on /positioning uses GPS, GLONASS, Galileo and BeiDou-3 (B1C/B2a). BeiDou is left out where the receiver antenna has no IGS20 calibration for the B1C/B2a bands: the GPS offsets that would stand in moved stations by 1–2 mm in height on the 24 h EPN benchmark, more than BeiDou added. It is also left out for JAVAD TRE_3 receivers, where it cost 1–2 cm, mostly in height, on every such IGS station checked. /campaign uses GPS, GLONASS and Galileo: on 24 h sessions BeiDou is neutral. QZSS can be added; it made no measurable difference. NavIC is not offered (no precise product carries it).
Cycle slips, outliers and convergence
- Detection — the Melbourne–Wübbena wide-lane and a time-differenced ionosphere-free phase test: each satellite's epoch-to-epoch phase change against the median of all satellites, which removes the receiver clock. A jump above 8 cm counts as a slip when it exceeds 30 cm, or when the geometry-free phase (3 cm) or the Melbourne–Wübbena combination (1.5 cycles) jumped too, so the satellite clock interpolation error between 5-minute samples does not trigger it. In kinematic mode the receiver's motion is estimated from the carrier first.
- Repair — after a gap of up to 120 s (or a loss-of-lock flag) the wide-lane jump is taken from the Melbourne–Wübbena combination and the L1 jump from the geometry-free phase with the ionosphere extrapolated across the gap. Only repairs consistent with integers are accepted; otherwise the ambiguity starts again.
- Outliers — code and phase innovations beyond 4σ are rejected; a satellite whose code residual is far from the others (15 m beyond the position uncertainty) is screened out.
- Convergence — static float PPP needs tens of minutes to reach the centimetre level; how far it gets with session length is in the validation below. The formal uncertainty of the filter is too optimistic, so the site never prints it alone (see where the checks stop).
Defaults
| Setting | Default | Note |
|---|---|---|
| Engine | Ionosphere-free, extended Kalman filter | Uncombined engine opt-in (advanced settings) |
| Constellations | PPP on /positioning: GPS, GLONASS, Galileo, BeiDou | /campaign: GPS, GLONASS, Galileo |
| Signal pairs | GPS L1/L2, GLONASS L1/L2, Galileo E1/E5a, BeiDou B1C/B2a | GPS L2 P(Y) when tracked, else L2C |
| Elevation cut-off | 10° | /campaign: 3° with VMF3, 10° otherwise |
| Code σ / phase σ at zenith | 3.0 m / 0.01 m | Ionosphere-free combination |
| Elevation weighting | σ² / sin²e, sin e floored at 0.1 | Flat below about 6° |
| Outlier gate | 4 σ on code and phase innovations | |
| Zenith wet delay | Random walk 3.5 mm/√h | A priori σ 0.5 m |
| Gradients | Off on /positioning; on in /campaign | A priori σ 3 mm, random walk 0.3 mm/√h |
| Receiver clock | White noise, one per constellation | With BeiDou: BeiDou-2, BeiDou-3 CAST and BeiDou-3 SECM apart |
| Ambiguities | One per satellite arc, a priori σ 100 m | |
| A priori position | RINEX header, else a code solution; σ 100 m | A surveyed start mark replaces it |
| Cycle-slip repair | On, gaps up to 120 s | Integer-consistent repairs only |
| Satellite clocks | From the SP3 (5 min), linear | 30 s clocks optional; always with ambiguity fixing |
| Ocean tide loading | On, from the built-in grid | A pasted BLQ entry takes precedence |
| Ambiguity fixing | On | See PPP ambiguity fixing |
Where it is in the code
Source
-
src/positioning/ppp.ts— the ionosphere-free engine (PppEngine, solvePpp), weighting, slip detection and repair, ZWD and gradients, the bias handling (applySatBiases) -
src/positioning/ppp-uncombined.ts— the uncombined engine: one slant ionosphere per satellite, every signal on its own -
src/positioning/ppp-signals.ts— signal selection for the uncombined engine -
src/positioning/ppp-corrections.ts— createPppCorrections: antenna, wind-up, tides and loading assembled per epoch and satellite -
src/positioning/ppp-antenna.ts— ANTEX phase centres combined for the pair, receiver-band fallback, phase wind-up -
src/positioning/ppp-tropo.ts— Niell mapping (the default when no VMF3/GPT3 model is given) -
src/positioning/clock-groups.ts— receiver-clock groups (BeiDou by generation and manufacturer) -
src/positioning/sat-attitude.ts— satellite attitude: nominal yaw steering, eclipse models, ORBEX quaternions -
src/rinex/sp3.ts— SP3 parsing and 9-point Lagrange interpolation of the orbits -
src/rinex/clk.ts— RINEX clock files (30 s clocks)
Tests
-
test/ppp.test.ts— static float PPP on ABMF (2024-01-01) with precise products; convergence; cycle-slip repair on ABMF; diagnostics leave the solution unchanged -
test/sat-attitude.test.ts— ORBEX quaternions, block names, nominal yaw steering -
test/ppp-uncombined.test.ts— the uncombined engine equals the ionosphere-free one on two frequencies; three and four frequencies; ionosphere map -
test/ppp-signals.test.ts— signal selection; per-signal corrections combine to the pair’s -
test/ppp-model-regressions.test.ts— satellite antenna valid on the date, antenna height along the vertical, phase wind-up -
test/ppp-product-consistency.test.ts— satellite antennas as the product assumes them; uncalibrated receiver antennas still get their height -
test/antenna-pco-order.test.ts— receiver PCO in North/East/Up order, as ANTEX 2.0 eq. (1) + (4)
Validation
- Static PPP against the IGS weekly solution — 25 IGS stations, three days (26–28 October 2026), 1650 sessions of 24, 8, 4 and 2 hours. 95 % of float sessions are within 1.0 cm horizontally and 1.7 cm vertically at 24 h, 1.4 / 2.6 cm at 8 h, 2.2 / 3.6 cm at 4 h and 4.5 / 5.9 cm at 2 h; these are the figures the survey report prints. Re-run on 16 November 2026 with the current engine, every figure came out 10–40 % better (table).
- Other services — the same files processed by NGS's OPUS and Geoscience Australia's AUSPOS agreed with the IGS coordinates equally well (a few millimetres horizontally, about a centimetre vertically; small samples).
- Daily coordinates on /campaign — about 40 EPN stations, five weeks between January 2024 and August 2026, against EUREF's weekly combination after a 7-parameter Helmert transformation: RMS 1.0–1.4 / 0.7 / 1.7–2.5 mm East / North / Up, ambiguities fixed. The EPN analysis centres scatter about the combination by 0.5–1.0 / 0.6–1.1 / 2.5–4.4 mm. The uncombined engine gives 0.9–1.3 / 0.5–0.8 / 1.5–2.1 mm on the same weeks.
- Model choices measured on the EPN benchmark (24 h, RMS after Helmert): estimating gradients took North from 1.7–2.2 to 0.9–1.1 mm over four weeks; the 3° cut-off with VMF3 took Up from 3.2 to 2.1 mm (week 2297, fixed).
- Troposphere — zenith total delays from the same runs agree with EUREF's combined product to 4.1 mm RMS (week 2430).
- In the browser — the PPP sample on /positioning processes a day at Wettzell and compares the result with EUREF's coordinate for that day.
The numbers, the stations and the limits are collected on the validation page; the overview is on Methods.